I have been meaning to post some pictures of the house lately. We are getting closer, still a ways to go, but it is nice to have a couple rooms just about completely done. I can say that I am more than 50% done with the painting. We now have pipes in the basement for the pluming and hopefully we can have the basement poured soon.
| Exposed beams in the ceiling with drywall up. |
| What will hopefully be the nursery some day. It is now done, just needs the chair rail. |
| pluming in the basement for the added bathroom |
| pluming out of the house |
| The quick way down stairs, just watch your step. |
| Master bedroom with two walls painted, |
| tile in the spare bathroom- without the grout |
| Primer in the family room. I like the tall ceilings, not so much of a fan painting them! |
| Tile is now done in the bathroom! Yea! Very close to being completely done with this room. |
No comments:
Post a Comment